Resource center
Technical guides for extrusion buyers.
Plan your production route, compare equipment scope and prepare the details needed for a useful quotation.
Technical guides
Practical answers before you order a line.
Explore equipment selection, process differences and the questions that make proposals easier to compare.
How to Increase Wood Flour Content in NFC & WPC Products
Explore moisture control, formulation and extrusion factors for higher wood flour loading, including PWG Additive and natural fiber options.
How to Choose an LVT Flooring Production Line
A buyer guide to LVT layer structure, lamination, output assumptions and equipment scope before requesting a production line quotation.
PVC Marble Sheet Manufacturing Process
Understand the PVC marble sheet production route, key quality checks and where lamination or UV coating fits into the equipment scope.
PVC Free Foam vs Celuka Foam Board: Production Differences
Compare free foam and Celuka board structures, sample checks and the information needed to choose a PVC foam board production route.
What Determines the Cost of an SPC Flooring Production Line?
Compare SPC flooring line quotations by equipment scope, product targets, finishing operations, installation responsibilities and acceptance conditions.
Factory Requirements for a Plastic Extrusion Line
Prepare workshop layout, electrical supply, cooling, material handling and installation responsibilities before ordering an extrusion line.

Before installation
Prepare the factory around the full production route.
Start with a workshop drawing, utility information and a clear division of installation responsibilities. Include material handling and finishing, not only the extruder footprint.
Read the factory checklistProject documents
Request information for your target product.
Tell us what you plan to manufacture so the discussion can focus on the relevant equipment and project conditions.
Discuss your production project
Share the product, material, dimensions, output target and factory conditions so the configuration can be reviewed.